Summary for Test 2025-03-11-16-16
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000014 DEA: 010H1504 EFIS: 0117000116 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-162-R0.0/25.7 |
| Award Date | 03/26/2024 |
| Closeout Date | Not set |
| Work Description | HMA, RHMA, AND GEOSYNTHETIC PAVEMENT INTERLAYER. |
| Location Description | MENDOCINO COUNTY NEAR LONGVALE FROM ROUTE 101 TO 1.1 MILES SOUTH OF POONKINNEY ROAD NEAR COVELO |
| QA Service Level | 1 (Verified on 01/10/2024) |
Sample Information
| Sample Taken Date | 03/11/2025 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/17/2025 |
| Sample type | Verification | A brief description of the sample | 1 can PG 58-22 |
| The quantity of what the sample constitutes | 1 can binder | From where was the sample collected | Source |
| First name of sampler or witnessed by | Felipe | Last name of sampler or witnessed by | Damian |
| Title of sampler | Plant QC | Telephone number of sampler | |
| Laboratory sample identification | 25-062 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Granite Ukiah | Transportation Laboratory (TL) Number | 931015 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-03-11-16
DIME Test ID: 2025-03-11-16-16
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-04-17
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: WSP
Date of test: 03/24/2025
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 206.319 grams
Mass of container #2 before test (m2i): 204.337 grams
Mass of container #1 after test (m1f): 206.116 grams
Mass of container #2 after test (m2f): 204.133 grams
Mass of empty container #1: 171.425 grams
Mass of empty container #2: 169.499 grams
Mass correction factor: 0.006
Average mass change: -0.578 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 4/17/2025 ✔
