Summary for Test 2025-04-09-27-5

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 1000478
DEA: 020K6404
EFIS: 0223000189
DIST-CO-RTE-PM02-SIS-97-18.0/22.4
Award Date12/31/2024
Closeout DateNot set
Work DescriptionCONSTRUCT WILDLIFE OVERPASS, INSTALL CULVERT, AND INSTALL FENCING.
Location DescriptionSISKIYOU COUNTY NEAR GRASS LAKE FROM 1.4 MILES NORTH OF DEER MOUNTAIN ROAD TO 0.6 MILE NORTH OF GRASS LAKE REST AREA
QA Service Level1 (Verified on 07/31/2024)

Sample Information

Sample Taken Date04/09/2025 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/09/2025
Sample typeQuality Control A brief description of the sample1 cubic ft. of Concrete for Testing
The quantity of what the sample constitutes1 cubic ft. of Concrete for Testing From where was the sample collectedFabricator
First name of sampler or witnessed byMark Patrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCon-Fab California, LLC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number98NV20AF
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected12528
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 1A, 3rd Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-04-09-27
DIME Test ID: 2025-04-09-27-5
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-04-15

Test Results


Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Patrick Baddu
Date of test: 04/09/2025
Air content: 4.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/15/2025