Summary for Test 2025-04-01-19-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 995085
DEA: 07322904
EFIS: 0716000059
DIST-CO-RTE-PM07-LA-27-0.0/18.6
Award Date11/06/2023
Closeout DateNot set
Work DescriptionREMOVE EXISTING AC PAVEMENT & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET
QA Service Level1 (Verified on 09/11/2023)

Sample Information

Sample Taken Date04/01/2025 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/01/2025
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes41 SY From where was the sample collectedJob Site
First name of sampler or witnessed byDominic Last name of sampler or witnessed byMontemayor
Title of samplerMaterials Tester Telephone number of sampler9517643140
Laboratory sample identification25-0979 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameADA Curb Ramp Victory Blvd. and CA-27 Subgrade Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-04-01-19
DIME Test ID: 2025-04-01-19-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-04-11

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 04/01/2025
In-place wet density: 1.95
Highest adjust wet density: 2.15
% Moisture: 18.9 %
Optimum Moisture: 16.9 %
Relative compaction: 91
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/11/2025