Summary for Test 2025-04-08-5-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000392
DEA: 07349904
EFIS: 0718000167
DIST-CO-RTE-PM07-LA-710-6.0/14.1
Award Date09/12/2024
Closeout DateNot set
Work DescriptionCONSTRUCT MVPS, MGS, ROCK BLANKETS,AND PAVE BEYOND THE GORE.
Location DescriptionLOS ANGELES COUNTY IN LONG BEACH AND COMPTOM FROM SHORELINE DRIVE TO 0.2 MILE NORTH OF ALONDRA BOULEVARD OVERCROSSING
QA Service Level1 (Verified on 08/12/2024)

Sample Information

Sample Taken Date04/08/2025 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing04/08/2025 Sample typeAcceptance
A brief description of the sampleAggregate Base The quantity of what the sample constitutes96 CY
From where was the sample collectedJob Site First name of sampler or witnessed byJacinto
Last name of sampler or witnessed byVillanueva Title of samplerTEC
Telephone number of sampler6268612347 Laboratory sample identification25-1097
Linked DIME Sample ID The fabricator/manufacturer/facility nameWest Coast Public Works
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleaggregate base
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedfrom various location at Aggregate Base
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-04-08-5
DIME Test ID: 2025-04-08-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-04-08

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 04/08/2025
Gage No.: 60247
Test No.: 1
Nuclear By: Jacinto Villanueva
Non-Bias Plan No.: 5
Depth: 7
Material No.: jobsite
Material Type: aggregate base
Impact By: Jacinto Villanueva
Standard Count Density: 2033 g/cc
Count or Density 1: 1.94 g/cc
Count or Density 2: 2 g/cc
Count or Density 3: 2.06 g/cc
Standard Count Moisture: 643 g/cc
Moisture Count 1: 0.19 g/cc
Moisture Count 2: 0.17 g/cc
Moisture Count 3: 0.18 g/cc
Sum of Count or Density: 6 g/cc
Average of Count or Density: 2 g/cc
Sum of Moisture Count: 0.54 g/cc
Average of Moisture Count: 0.18 g/cc
Calculated Percent Relative Compaction: 94.3 %
Reported Percent Relative Compaction: 94 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/8/2025 ✔