Summary for Test 2025-03-03-41-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 993825 DEA: 040Q30U4 EFIS: 0420000235 COOP: 042830A3,042830A4 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA,CC-680-R11.0/R21.9,R0.0/R0.9 |
| Award Date | 11/23/2022 |
| Closeout Date | Not set |
| Work Description | PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC |
| Location Description | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON BETWEEN 0.4 MILE SOUTH OF CALAVERAS ROAD UNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 03/03/2025 | Sample Unique Key | 41 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/03/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 2700g | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Vega |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | SJ-030325-AB3 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Martin Marietta Sunol | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Hwy 680 SB Lt "ESB" Line Roadway Section | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Aggregate Base |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite - Compacted Aggregate Base | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-03-03-41
DIME Test ID: 2025-03-03-41-2
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-03-07
Test Results
Is oversize material: No
Input Type: Calculated
Tester's full name: Charles Poolis
Date of test: 03/03/2025
In-place wet density: 2.30
Highest adjust wet density: 2.39
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters): Hwy 680 SB Lt "ESB" Line Roadway Section
Test was verified on 4/6/2025 ✔
