Summary for Test 2025-04-03-4-12
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-32.5/49.8 |
| Award Date | 01/12/2024 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE |
| QA Service Level | 1 (Verified on 09/26/2023) |
Sample Information
| Sample Taken Date | 04/03/2025 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/03/2025 |
| Sample type | Acceptance | A brief description of the sample | MAINLINE |
| The quantity of what the sample constitutes | MAINLINE | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
| Title of sampler | Telephone number of sampler | 9152961873 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | |
| Direction of Travel | Post Mile | ||
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2025-04-03-4
DIME Test ID: 2025-04-03-4-12
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-04-03
Test Results
Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 04/03/2025
Air Temperature: 57
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN PROJECT
Edge used to measure position: LEFT OF EDGE
Project Stationing 1: 1200+00
Project Stationing 2: 1200+25
Project Stationing 3: 1200+50
Project Stationing 4: 1200+75 ft
Project Stationing 5: 1201+00 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 5
Position for Stationing 2: 5
Position for Stationing 3: 5
Position for Stationing 4: 5 ft
Position for Stationing 5: 5 ft
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Percent Grade for 4th Stationing: 0.0 %
Percent Grade for 5th Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.31
Corrected Coefficients of Friction for Stationing 2: 0.30
Corrected Coefficients of Friction for Stationing 3: 0.29
Corrected Coefficients of Friction for Stationing 4: 0.31
Corrected Coefficients of Friction for Stationing 5: 0.31
Average Coefficient of Friction: 0.30
General comments (publicly viewable) (Max 1000 characters): 1300FT AFTER MOSHER UC
Test was verified on 4/3/2025 ✔