Summary for Test 2025-04-02-5-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995320 DEA: 072XC604 EFIS: 0723000084 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-33-12.6/16.5, 12.6/23.75 |
| Award Date | 01/09/2023 |
| Closeout Date | Not set |
| Work Description | Remove the mud and debris from the roadway, repair the eroded slopes, clean the drainage systems and basins, repair the damaged shoulders and roadside signs and markers, and fix the compromised drainage system |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/27/2023) |
Sample Information
| Sample Taken Date | 04/02/2025 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/02/2025 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 800 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
| Laboratory sample identification | 25-1015 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Subgrade |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-04-02-5
DIME Test ID: 2025-04-02-5-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-04-02
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 04/02/2025
Gage No.: 60392
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 3
Depth: 12
Material No.: no data
Material Type: Subgrade
Impact By: Michelangelo Sese
Standard Count Density: 1546 g/cc
Count or Density 1: 2.25 g/cc
Count or Density 2: 2.21 g/cc
Count or Density 3: 2.27 g/cc
Standard Count Moisture: 655 g/cc
Moisture Count 1: 0.16 g/cc
Moisture Count 2: 0.19 g/cc
Moisture Count 3: 0.17 g/cc
Sum of Count or Density: 6.73 g/cc
Average of Count or Density: 2.24 g/cc
Sum of Moisture Count: 0.52 g/cc
Average of Moisture Count: 0.17 g/cc
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): VEN Hwy 33 @ PM 23.48
Test was verified on 4/2/2025 ✔
