Summary for Test 2025-03-28-7-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 212720
DEA: 07291404
EFIS: 0712000094
DIST-CO-RTE-PM07-LA-1-55-58
Award Date02/18/2021
Closeout Date04/23/2026
Work DescriptionTRANCAS CREEK BRIDGE REPLACEMENT
Location DescriptionIN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027).
QA Service Level1 (Verified on 04/02/2021)

Sample Information

Sample Taken Date03/28/2025 Sample Unique Key7
Date that the sample was received by the laboratory/organization performing the testing03/28/2025 Sample typeAcceptance
A brief description of the sampleStructural Backfill The quantity of what the sample constitutes1650 SF
From where was the sample collectedJob Site First name of sampler or witnessed byMichelangelo
Last name of sampler or witnessed bySese Title of samplerTET
Telephone number of sampler310-345-6204 Laboratory sample identification25-0943
Linked DIME Sample ID The fabricator/manufacturer/facility nameNA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameTrancas Creek Bridge
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleStructural Backfill
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedVarious locations
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-03-28-7
DIME Test ID: 2025-03-28-7-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-03-28

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 03/28/2025
Gage No.: 63092
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 2
Depth: 5
Material No.: no data
Material Type: Structural Backfill
Impact By: Michelangelo Sese
Standard Count Density: 1554 g/cc
Count or Density 1: 2.23 g/cc
Count or Density 2: 2.29 g/cc
Count or Density 3: 2.35 g/cc
Standard Count Moisture: 664 g/cc
Moisture Count 1: 0.11 g/cc
Moisture Count 2: 0.13 g/cc
Moisture Count 3: 0.13 g/cc
Sum of Count or Density: 6.87 g/cc
Average of Count or Density: 2.29 g/cc
Sum of Moisture Count: 0.37 g/cc
Average of Moisture Count: 0.12 g/cc
Calculated Percent Relative Compaction: 97.4 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters): SB Rte. 1 in Malibu Trancas Creek Bridge Abutment #1

Test was verified on 3/28/2025 ✔