Summary for Test 2025-03-19-21-7

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 2328
DEA: 04444444
DIST-CO-RTE-PM04-ALA--
Award DateNot set
Closeout DateNot set
Work DescriptionGeneral work
Location DescriptionNot set
QA Service Level1 (Verified on 09/20/2005)

Sample Information

Sample Taken Date03/19/2025 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/19/2025
Sample typeQuality Control A brief description of the sampleAsphalt Binder Sample
The quantity of what the sample constitutes40 tons From where was the sample collectedSource
First name of sampler or witnessed byDaniel Last name of sampler or witnessed byVirkler
Title of sampler Telephone number of sampler7024459013
Laboratory sample identificationZ32210645 Linked DIME Sample ID
The fabricator/manufacturer/facility nameErgon Asphalt and Emulsions Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierErgon Asphalt & Emulsions Incorporated - Las Vegas NV MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2025-03-19-21
DIME Test ID: 2025-03-19-21-7
Testing Lab: Ergon Asphalt & Emulsions
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2025-03-24

Test Results


Input Type: Calculated
Tester's full name: Dan Virkler
Date of test: 03/19/2025
% Elongation Recovery: 90 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/24/2025