Summary for Test 2025-03-03-4-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 995085
DEA: 07322904
EFIS: 0716000059
DIST-CO-RTE-PM07-LA-27-0.0/18.6
Award Date11/06/2023
Closeout DateNot set
Work DescriptionREMOVE EXISTING AC PAVEMENT & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET
QA Service Level1 (Verified on 09/11/2023)

Sample Information

Sample Taken Date03/03/2025 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2025
Sample typeAcceptance A brief description of the sampleSubgrade
The quantity of what the sample constitutes200 SF From where was the sample collectedJob Site
First name of sampler or witnessed byMichelangelo Last name of sampler or witnessed bySese
Title of samplerTET Telephone number of sampler310-345-6204
Laboratory sample identification25-0688 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedVarious locations
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-03-03-4
DIME Test ID: 2025-03-03-4-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-03-04

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 03/03/2025
In-place wet density: 1.89
Highest adjust wet density: 2.15
% Moisture: 21.9 %
Optimum Moisture: no data
Relative compaction: 88
General comments (publicly viewable) (Max 1000 characters): CA Rte. 27 Curb Ramp C-123 Topanga Canyon Blvd & Gault St

Test was verified on 3/4/2025