Summary for Test 2025-02-24-4-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000208
DEA: 07346004
EFIS: 0718000070
DIST-CO-RTE-PM07-LA-101-11.0/23.5
Award Date07/12/2024
Closeout DateNot set
Work DescriptionCONSTRUCT MVPS, PAVE BEYOND THE GORE, INSTALL GATES & CABLE RAILING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE
QA Service Level1 (Verified on 04/24/2024)

Sample Information

Sample Taken Date02/24/2025 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/24/2025
Sample typeAcceptance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes130 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler8182096574
Laboratory sample identification25-0627 Linked DIME Sample ID
The fabricator/manufacturer/facility nameYakar Inc. Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleAggregate Base
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedfrom various location at Aggregate Base
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-02-24-4
DIME Test ID: 2025-02-24-4-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-02-25

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 02/24/2025
Gage No.: 60247
Test No.: 1
Nuclear By: Jacinto Villanueva
Non-Bias Plan No.: 3
Depth: 5 Inches
Material No.: jobsite
Material Type: aggregate base
Impact By: Jacinto Villanueva
Standard Count Density: 2039 g/cc
Count or Density 1: 2 g/cc
Count or Density 2: 2.05 g/cc
Count or Density 3: 2 g/cc
Standard Count Moisture: 642 g/cc
Moisture Count 1: 0.17 g/cc
Moisture Count 2: 0.19 g/cc
Moisture Count 3: 0.18 g/cc
Sum of Count or Density: 6.05 g/cc
Average of Count or Density: 2.02 g/cc
Sum of Moisture Count: 0.54 g/cc
Average of Moisture Count: 0.18 g/cc
Calculated Percent Relative Compaction: 94.7 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/25/2025