Summary for Test 2025-02-24-4-1

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 1000208
DEA: 07346004
EFIS: 0718000070
DIST-CO-RTE-PM07-LA-101-11.0/23.5
Award Date07/12/2024
Closeout DateNot set
Work DescriptionCONSTRUCT MVPS, PAVE BEYOND THE GORE, INSTALL GATES & CABLE RAILING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE
QA Service Level1 (Verified on 04/24/2024)

Sample Information

Sample Taken Date02/24/2025 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/24/2025
Sample typeAcceptance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes130 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler8182096574
Laboratory sample identification25-0627 Linked DIME Sample ID
The fabricator/manufacturer/facility nameYakar Inc. Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleAggregate Base
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedfrom various location at Aggregate Base
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-02-24-4
DIME Test ID: 2025-02-24-4-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-02-25

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 02/24/2025
In-place wet density: 2.02
Highest adjust wet density: 2.13
% Moisture: 9.8 %
Optimum Moisture: 12.8 %
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/25/2025