Summary for Test 2025-01-07-46-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 995320
DEA: 072XC604
EFIS: 0723000084
DIST-CO-RTE-PM07-VEN-33-12.6/16.5, 12.6/23.75
Award Date01/11/2023
Closeout DateNot set
Work DescriptionRemove the mud and debris from the roadway, repair the eroded slopes, clean the drainage systems and basins, repair the damaged shoulders and roadside signs and markers, and fix the compromised drainage system
Location DescriptionNot set
QA Service Level1 (Verified on 11/27/2023)

Sample Information

Sample Taken Date01/07/2025 Sample Unique Key46
Date that the sample was received by the laboratory/organization performing the testing01/07/2025 Sample typeAcceptance
A brief description of the sampleHWY 33 PM 14.35 The quantity of what the sample constitutes284 sy
From where was the sample collectedJob Site First name of sampler or witnessed byCaesar
Last name of sampler or witnessed byRamirez Title of samplerTransportation Engineer Civil
Telephone number of sampler(818) 974-8391 Laboratory sample identification25-0077
Linked DIME Sample ID The fabricator/manufacturer/facility nameContractor
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameHWY 33 PM 14.35
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJob site
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-01-07-46
DIME Test ID: 2025-01-07-46-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-02-14

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Caesar Ramirez
Date of test: 01/07/2025
Gage No.: 31106
Test No.: 1
Nuclear By: Caesar Ramirez
Non-Bias Plan No.: 7
Depth: 11"
Material No.: Subgrade Backfill
Material Type: Subgrade
Impact By: Caesar Ramirez
Standard Count Density: 2165 g/cc
Count or Density 1: 2.18 g/cc
Count or Density 2: 2.12 g/cc
Count or Density 3: 2.13 g/cc
Standard Count Moisture: 618 g/cc
Moisture Count 1: 0.13 g/cc
Moisture Count 2: 0.13 g/cc
Moisture Count 3: 0.14 g/cc
Sum of Count or Density: 6.43 g/cc
Average of Count or Density: 2.14 g/cc
Sum of Moisture Count: 0.4 g/cc
Average of Moisture Count: 0.13 g/cc
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Notified inspector Abdul Mawardi of result

Test was verified on 2/14/2025 ✔