Summary for Test 2025-01-20-2-3

Test performed: CTM 211-May 2010

Project Information

Project IdentifiersProject ID: 66666
DEA: APP
EFIS: 0019000052
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date01/20/2025 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing01/20/2025 Sample typeAggregate Prequalification Program
A brief description of the sample3/8" Aggregate The quantity of what the sample constitutes1 50lb bucket of 3/8" Aggregate
From where was the sample collectedSource First name of sampler or witnessed byJustin
Last name of sampler or witnessed byYettou Title of samplerQC Technician
Telephone number of sampler619-592-9623 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta - Santee
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-20-2
DIME Test ID: 2025-01-20-2-3
Testing Lab: Martin Marietta
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2025-02-14

Test Results


How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Austin Hill
Date of test: 02/03/2025
Grading: C
Percent wear: 20 %
General comments (publicly viewable) (Max 1000 characters):

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
Caltrans DIME Testing 2025pdf390.79 KB02/14/20252025-01-20-2-3   Info

Test was verified on 2/14/2025