Summary for Test 2025-02-11-12-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000301 DEA: 07333704 EFIS: 0716000316 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-43.4/51.4 |
| Award Date | 07/30/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT ADA CURB RAMPS, SIDEWALK, AND DRIVEWAY. |
| Location Description | LOS ANGELES COUNTY IN PALMDALE FROM ROUTE 14 JUNCTION (SOUTH) TO AVENUE T |
| QA Service Level | 1 (Verified on 08/12/2024) |
Sample Information
| Sample Taken Date | 02/11/2025 | Sample Unique Key | 12 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/11/2025 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 367 yd2 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Lou Ralph | Last name of sampler or witnessed by | Achuela |
| Title of sampler | TET | Telephone number of sampler | 2138170504 |
| Laboratory sample identification | 25-0546 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AM Concrete | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Subgrade |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at subgrade | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-02-11-12
DIME Test ID: 2025-02-11-12-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-02-13
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Lou Ralph Achuela
Date of test: 02/11/2025
Gage No.: 31104
Test No.: 1
Nuclear By: Lou Ralph Achuela
Non-Bias Plan No.: 2
Depth: 5''
Material No.: On-Site
Material Type: Subgrade
Impact By: Lou Ralph Achuela
Standard Count Density: 1983 g/cc
Count or Density 1: 2.06 g/cc
Count or Density 2: 2.09 g/cc
Count or Density 3: 2.15 g/cc
Standard Count Moisture: 663 g/cc
Moisture Count 1: 0.09 g/cc
Moisture Count 2: 0.12 g/cc
Moisture Count 3: 0.14 g/cc
Sum of Count or Density: 6.3 g/cc
Average of Count or Density: 2.1 g/cc
Sum of Moisture Count: 0.35 g/cc
Average of Moisture Count: 0.12 g/cc
Calculated Percent Relative Compaction: 90.5 %
Reported Percent Relative Compaction: 91 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/13/2025 ✔
