Summary for Test 2025-02-07-4-3
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Sample Information
| Sample Taken Date | 02/07/2025 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/07/2025 |
| Sample type | Acceptance | A brief description of the sample | 1x4 agg and Sand |
| The quantity of what the sample constitutes | OHSS #5 CIDH | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Kyle | Last name of sampler or witnessed by | Engen |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CalPortland Paso Robles | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | OHSS #5 CIDH | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-40-0013 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Feed Belt/Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | 590RM1010 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-02-07-4
DIME Test ID: 2025-02-07-4-3
Testing Lab: CT D05 - Whitley Gardens Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-02-10
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: S. Zepeda
Date of test: 02/10/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.3
Sand reading (test 1): 4
Sand equivalent (test 1): 76
Sand equivalent before temperature correction: 76
Sand equivalent after temperature correction: 76
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/10/2025 ✔
