Summary for Test 2025-02-01-8-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994582
DEA: 073203U4
EFIS: 0722000071
DIST-CO-RTE-PM07-LA-91,605-R16.6/R16.8,R0.0/R10.4
Award Date06/20/2023
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT.
Location DescriptionLOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING
QA Service Level1 (Verified on 07/12/2023)

Sample Information

Sample Taken Date02/01/2025 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/01/2025
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes466 SY From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byCarranza
Title of samplerMaterials Tester Telephone number of sampler2132384209
Laboratory sample identification25-0421 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSB 605 Segment #4A Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-02-01-8
DIME Test ID: 2025-02-01-8-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-02-05

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 02/01/2025
Gage No.: 86217
Test No.: 1
Nuclear By: Fernando Carranza
Non-Bias Plan No.: 3
Depth: 6"
Material No.: Native
Material Type: Subgrade
Impact By: Fernando Carranza
Standard Count Density: 2426 g/cc
Count or Density 1: 2212 g/cc
Count or Density 2: 2203 g/cc
Count or Density 3: 2149 g/cc
Standard Count Moisture: 710 g/cc
Moisture Count 1: 217 g/cc
Moisture Count 2: 222 g/cc
Moisture Count 3: 212 g/cc
Sum of Count or Density: 6564 g/cc
Average of Count or Density: 2188 g/cc
Sum of Moisture Count: 651 g/cc
Average of Moisture Count: 217 g/cc
Calculated Percent Relative Compaction: 96.4 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/5/2025