Summary for Test 2024-12-30-18-6
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
| Award Date | 04/26/2022 |
| Closeout Date | Not set |
| Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
| Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 12/30/2024 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/30/2024 |
| Sample type | Annual Source Testing | A brief description of the sample | 1x4 concrete aggregates |
| The quantity of what the sample constitutes | 6 Bags | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Anthony | Last name of sampler or witnessed by | Valdez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Canyon Rock Forestville | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-49-0004 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-12-30-18
DIME Test ID: 2024-12-30-18-6
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-02-05
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: Anthony Valdez
Date of test: 02/04/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.3
Sand reading (test 1): 3.6
Clay reading (test 2): 4.1
Sand reading (test 2): 3.5
Clay reading (test 3): 4.3
Sand reading (test 3): 3.5
Sand equivalent (test 1): 84
Sand equivalent (test 2): 86
Sand equivalent (test 3): 82
Sand equivalent before temperature correction: 84
Sand equivalent after temperature correction: 84
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/5/2025 ✔
