Summary for Test 2024-12-24-5-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 1000208
DEA: 07346004
EFIS: 0718000070
DIST-CO-RTE-PM07-LA-101-11.0/23.5
Award Date07/12/2024
Closeout DateNot set
Work DescriptionCONSTRUCT MVPS, PAVE BEYOND THE GORE, INSTALL GATES & CABLE RAILING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE
QA Service Level1 (Verified on 04/24/2024)

Sample Information

Sample Taken Date12/24/2024 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/24/2024
Sample typeAcceptance A brief description of the sampleNB Balboa off-ramp Location 39 19+13 to 19+98
The quantity of what the sample constitutes133 sy From where was the sample collectedJob Site
First name of sampler or witnessed byCaesar Last name of sampler or witnessed byRamirez
Title of samplerTransportation Engineer Civil Telephone number of sampler(818) 974-8391
Laboratory sample identification24-3987 Linked DIME Sample ID
The fabricator/manufacturer/facility nameContractor Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameNB Balboa off-ramp Location 39 19+13 to 19+98 Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJob Site
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-12-24-5
DIME Test ID: 2024-12-24-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-02-05

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Caesar Ramirez
Date of test: 12/24/2024
In-place wet density: 1.79
Highest adjust wet density: 2.04
% Moisture: 9.1 %
Optimum Moisture: 11.1 %
Relative compaction: 88
General comments (publicly viewable) (Max 1000 characters): Notified inspector Sam Manila of result

Test was verified on 2/5/2025