Summary for Test 2024-12-24-5-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000208
DEA: 07346004
EFIS: 0718000070
DIST-CO-RTE-PM07-LA-101-11.0/23.5
Award Date07/12/2024
Closeout DateNot set
Work DescriptionCONSTRUCT MVPS, PAVE BEYOND THE GORE, INSTALL GATES & CABLE RAILING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE
QA Service Level1 (Verified on 04/24/2024)

Sample Information

Sample Taken Date12/24/2024 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/24/2024
Sample typeAcceptance A brief description of the sampleNB Balboa off-ramp Location 39 19+13 to 19+98
The quantity of what the sample constitutes133 sy From where was the sample collectedJob Site
First name of sampler or witnessed byCaesar Last name of sampler or witnessed byRamirez
Title of samplerTransportation Engineer Civil Telephone number of sampler(818) 974-8391
Laboratory sample identification24-3987 Linked DIME Sample ID
The fabricator/manufacturer/facility nameContractor Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameNB Balboa off-ramp Location 39 19+13 to 19+98 Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJob Site
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-12-24-5
DIME Test ID: 2024-12-24-5-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-02-05

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Caesar Ramirez
Date of test: 12/24/2024
Gage No.: 31106
Test No.: 1
Nuclear By: Caesar Ramirez
Non-Bias Plan No.: 7
Depth: 5"
Material No.: Native
Material Type: Subgrade
Impact By: Caesar Ramirez
Standard Count Density: 2152 g/cc
Count or Density 1: 1.81 g/cc
Count or Density 2: 1.81 g/cc
Count or Density 3: 1.81 g/cc
Standard Count Moisture: 621 g/cc
Moisture Count 1: 0.15 g/cc
Moisture Count 2: 0.14 g/cc
Moisture Count 3: 0.15 g/cc
Sum of Count or Density: 5.43 g/cc
Average of Count or Density: 1.81 g/cc
Sum of Moisture Count: 0.44 g/cc
Average of Moisture Count: 0.15 g/cc
Calculated Percent Relative Compaction: 88.7 %
Reported Percent Relative Compaction: 88 %
General comments (publicly viewable) (Max 1000 characters): Notified inspector Sam Manila of result

Test was verified on 2/5/2025