Summary for Test 2024-09-04-143-7
Test performed: ASTM C39-21Project Information
| Project Identifiers | Project ID: 995524 DEA: 021H3604 EFIS: 0216000040 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96-76.8/78.0 |
| Award Date | 03/22/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGE. |
| Location Description | SISKIYOU COUNTY NEAR HORSE CREEK FROM 0.4 MILE WEST OF KLAMATH RIVER BRIDGE TO 2.0 MILES WEST OF KOHL CREEK |
| QA Service Level | 1 (Verified on 12/27/2023) |
Sample Information
| Sample Taken Date | 09/04/2024 | Sample Unique Key | 143 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 10/04/2024 |
| Sample type | Quality Control | A brief description of the sample | Concrete |
| The quantity of what the sample constitutes | 73.5 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jaime Rios Godoy | Last name of sampler or witnessed by | Godoy |
| Title of sampler | QC Technician | Telephone number of sampler | 5623219840 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | MSC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Abut 4 CIDH Piles 3,9,15 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | KCIDH |
|---|---|---|---|
| The truck number from where the sample was collected | First Truck | The batch plant ticket number from where the sample was collected | Not applicable |
| Concrete batch plant | Onsite | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-09-04-143
DIME Test ID: 2024-09-04-143-7
Testing Lab: Myers and Sons Construction
Test Method: ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2025-01-31
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Jaime Rios Godoy
Date of test: 09/17/2024
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Apparent mass of submerged cylinder 1: 0 lb
Average diameter of cylinder 1: 4.00 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 7330 lb
Maximum load on cylinder 2: 6990 lb
Maximum load on cylinder 3: 6980 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Type of fracture pattern of cylinder 3: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.57 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength (to nearest 10 psi): 7100 psi
Serial number of delivery ticket, if available: no data
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 09-17-24 02-1H6304 RTE 96 KCIDH CIPSC (Aggregates) REV | 239.74 KB | 01/31/2025 | 2024-09-04-143-7 | Info |
Test was verified on 1/31/2025 ✔
