Summary for Test 2025-01-15-21-4
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
| Award Date | 06/22/2022 |
| Closeout Date | 12/02/2025 |
| Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2021) |
Sample Information
| Sample Taken Date | 01/15/2025 | Sample Unique Key | 21 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/15/2025 |
| Sample type | Acceptance | A brief description of the sample | Skid Testing Request |
| The quantity of what the sample constitutes | Multiple Lanes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Wilson |
| Title of sampler | Telephone number of sampler | 916-601-9091 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Builders Concrete Sanger and Ashlan | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 20- | |
| Structure name | JPCP on R5 line | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | JPCP (Jointed Plain Concrete Pavement) |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | 06-MAD-99-R6.9/R7.6 |
| Direction of Travel | North | Post Mile | |
| Lanes to be Tested | Lane #1 | Station | 26+90,29+50 and between R5 32+70 |
Test Details
DIME Sample ID: 2025-01-15-21
DIME Test ID: 2025-01-15-21-4
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-02-03
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 01/28/2025
Air Temperature: 58
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: LEFT OF WALL
Edge used to measure position: BEGIN BRIDGE
Reference Distance 1: 50
Reference Distance 2: 53
Reference Distance 3: 56
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 12
Position for Stationing 2: 12
Position for Stationing 3: 12
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.37
Corrected Coefficients of Friction for Stationing 3: 0.38
Average Coefficient of Friction: 0.37
General comments (publicly viewable) (Max 1000 characters): NB 99 COTTONWOOD BRIDGE
Test was verified on 2/3/2025 ✔
