Summary for Test 2024-08-02-97-4
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 214698 DEA: 120N8904 EFIS: 1214000130 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-133-8.3/M9.3 |
| Award Date | 11/09/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT AUXILIARY LANE. |
| Location Description | ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 02/22/2021) |
Sample Information
| Sample Taken Date | 08/02/2024 | Sample Unique Key | 97 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/03/2024 | Sample type | Quality Control |
| A brief description of the sample | 4x8 Cylinders | The quantity of what the sample constitutes | 9 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Ivan |
| Last name of sampler or witnessed by | Lopez | Title of sampler | QC Field Technician |
| Telephone number of sampler | Laboratory sample identification | Set 1 | |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | Job Site |
| Transportation Laboratory (TL) Number | Unknown | Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown |
| Structure unique identifier | 00-0000 | Structure name | Barrier at S/B RTE 133 to RTE 405 |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S63C453T14 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | Barrier @ S/B RTE 133 to RTE 405 (STA 58+00- 59+20/ STA 59+40- 60+00) | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2024-08-02-97
DIME Test ID: 2024-08-02-97-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2025-02-21
Test Results
Input Type: Calculated
Tester's full name: Ivan Lopez
Date of test: 08/02/2024
Temperature: 90 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/21/2025 ✔