Summary for Test 2025-01-11-1-7
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000578 DEA: 112N1704 EFIS: 1122000283 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-15.72-28.3 |
| Award Date | 05/20/2024 |
| Closeout Date | 06/09/2025 |
| Work Description | Bridge Preservation |
| Location Description | In San Diego at various locations from Landis Street Overcrossing to Sorrento Valley Boulevard Undercrossing |
| QA Service Level | 1 (Verified on 09/03/2024) |
Sample Information
| Sample Taken Date | 01/11/2025 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/14/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PSU |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Derrick | Last name of sampler or witnessed by | McCovy |
| Title of sampler | TET | Telephone number of sampler | 6193722435 |
| Laboratory sample identification | 1601-PSU | Linked DIME Sample ID | 2025-01-11-02 |
| The fabricator/manufacturer/facility name | Vulcan Otay | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 220817 Otay Val | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-01-11-1
DIME Test ID: 2025-01-11-1-7
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-01-24
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Shawn Rivers
Date of test: 01/24/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4011.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 5660.6 g
Mass of HMA Sample prior to ignition: 1649.3 g
Mass Loss: 105.0 g
Mass of aggregate remaining after ignition: 1544.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.37 %
General comments (publicly viewable) (Max 1000 characters): RAP Complies
Test was verified on 1/24/2025 ✔
