Summary for Test 2025-01-17-23-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 214649
DEA: 07316004
EFIS: 0715000194
DIST-CO-RTE-PM07-LA-14-60.70
Award Date02/07/2023
Closeout DateNot set
Work DescriptionREHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location DescriptionROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
QA Service Level1 (Verified on 01/29/2020)

Sample Information

Sample Taken Date01/17/2025 Sample Unique Key23
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/17/2025
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes1955 SY From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byCarranza
Title of samplerMaterials Tester Telephone number of sampler2132384209
Laboratory sample identification25-0243 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameNB SR-14 Outside Lane/Shoulder (North of Avenue D) Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-17-23
DIME Test ID: 2025-01-17-23-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-01-23

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 01/17/2025
In-place wet density: 2.08
Highest adjust wet density: 2.13
% Moisture: 11.2 %
Optimum Moisture: 13.2 %
Relative compaction: 98
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/23/2025