Summary for Test 2024-10-08-5-5

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 995485
DEA: 031H1304
EFIS: 0316000059
DIST-CO-RTE-PM03-SAC,SAC-12-0/0.7
Award Date03/29/2024
Closeout Date05/23/2025
Work DescriptionPLACE POLYESTER CONCRETE OVERLAY AND REPLACE BRIDGE RAILING.
Location DescriptionSOLANO AND SACRAMENTO COUNTIES IN AND NEAR RIO VISTA FROM VIRGINIA DRIVE TO ROUTE 160
QA Service Level1 (Verified on 01/17/2024)

Sample Information

Sample Taken Date10/08/2024 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing10/08/2024 Sample typeAcceptance
A brief description of the samplePOLY/METH The quantity of what the sample constitutesPOLY/METH
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byTHAKUR Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE
Direction of Travel Post Mile
Lanes to be Tested Station

Test Details

DIME Sample ID: 2024-10-08-5
DIME Test ID: 2024-10-08-5-5
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-01-22

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 01/22/2025
Air Temperature: 45 F
Tire Pressure: 25 psi
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN DEPARTURE SLAB
Edge used to measure position: LEFT OF BARRIER
Reference Distance 1: 8 ft
Reference Distance 2: 11 ft
Reference Distance 3: 14 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 6 ft
Position for Stationing 2: 6 ft
Position for Stationing 3: 6 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.31
Corrected Coefficients of Friction for Stationing 2: 0.35
Corrected Coefficients of Friction for Stationing 3: 0.31
Average Coefficient of Friction: 0.32
General comments (publicly viewable) (Max 1000 characters): RIO VISTA BRIDGE #23-0024 EB DEPARTURE SLAB.WB VISUALLY INSPECTED AND FOUND SOME AREAS TO BE JUST LIKE EB WHICH WOULD ALSO RESULT IN SAME NUMBERS

Test was verified on 1/22/2025 ✔