Summary for Test 2025-01-13-21-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000245
DEA: 072XN104
EFIS: 0724000222
DIST-CO-RTE-PM07-VEN-150-
Award DateNot set
Closeout DateNot set
Work DescriptionRetaining wall repair due to landslide emergency at Route 150 in Santa Paula.
Location DescriptionRoute 150 in Santa Paula.
QA Service Level1 (Verified on 04/05/2024)

Sample Information

Sample Taken Date01/13/2025 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/13/2025
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes880 SY From where was the sample collectedJob Site
First name of sampler or witnessed byDominic Last name of sampler or witnessed by Montemayor
Title of samplerMaterials Tester Telephone number of sampler9517643140
Laboratory sample identification25-0143 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSubgrade compaction SP 150; PM 31.33 Lift 4 Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-13-21
DIME Test ID: 2025-01-13-21-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-01-17

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 01/13/2025
Gage No.: 6682
Test No.: 1
Nuclear By: Dominic Montemayor
Non-Bias Plan No.: 8
Depth: 12"
Material No.: Native
Material Type: Subgrade
Impact By: Dominic Montemayor
Standard Count Density: 10844 g/cc
Count or Density 1: 4070 g/cc
Count or Density 2: 3572 g/cc
Count or Density 3: 3519 g/cc
Standard Count Moisture: 19384 g/cc
Moisture Count 1: 6021 g/cc
Moisture Count 2: 5652 g/cc
Moisture Count 3: 5676 g/cc
Sum of Count or Density: 11161 g/cc
Average of Count or Density: 3720.33 g/cc
Sum of Moisture Count: 17349 g/cc
Average of Moisture Count: 5783 g/cc
Calculated Percent Relative Compaction: 91.3 %
Reported Percent Relative Compaction: 91 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/17/2025