Summary for Test 2025-01-13-20-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994297
DEA: 07336804
EFIS: 0717000014
DIST-CO-RTE-PM07-LA-118-R4.5/R9.1
Award Date11/17/2022
Closeout Date03/26/2026
Work DescriptionPLACE CONCRETE AND INSTALL RAILINGS.
Location DescriptionTHE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE WEST OF TAMPA AVENUE TO WOODLEY AVENUE
QA Service Level1 (Verified on 10/06/2022)

Sample Information

Sample Taken Date01/13/2025 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing01/13/2025 Sample typeQuality Assurance
A brief description of the sampleStructural Backfill The quantity of what the sample constitutes2.44 SY
From where was the sample collectedJob Site First name of sampler or witnessed byFernando
Last name of sampler or witnessed byCarranza Title of samplerMaterials Tester
Telephone number of sampler2132384209 Laboratory sample identification25-0156
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameWB Route 118 Location #32 EB Ruffner Under Ruffner Bridge
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleStructural backfill The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-13-20
DIME Test ID: 2025-01-13-20-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-01-17

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 01/13/2025
Gage No.: 86217
Test No.: 2
Nuclear By: Fernando Carranza
Non-Bias Plan No.: 6
Depth: 12"
Material No.: Structural Backfill
Material Type: Structural Backfill
Impact By: Fernando Carranza
Standard Count Density: 2504 g/cc
Count or Density 1: 476 g/cc
Count or Density 2: 702 g/cc
Count or Density 3: 531 g/cc
Standard Count Moisture: 782 g/cc
Moisture Count 1: 114 g/cc
Moisture Count 2: 107 g/cc
Moisture Count 3: 105 g/cc
Sum of Count or Density: 1709 g/cc
Average of Count or Density: 569.67 g/cc
Sum of Moisture Count: 326 g/cc
Average of Moisture Count: 108.67 g/cc
Calculated Percent Relative Compaction: 96.7 %
Reported Percent Relative Compaction: 97 %