Summary for Test 2024-11-12-10-4

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994859
DEA: 021H5904
EFIS: 0216000025
DIST-CO-RTE-PM02-SIS-96-43.5,57.0
Award Date08/07/2023
Closeout DateNot set
Work DescriptionREPLACE CULVERTS WITH BRIDGES, STREAMBED RESTORATION, & LANDSCAPING.
Location DescriptionSISKIYOU COUNTY AT AND NEAR HAPPY CAMP AT 0.8 MILE WEST OF GORDON\\'S FERRY ROAD AND AT PORTUGUESE CREEK
QA Service Level1 (Verified on 08/10/2023)

Sample Information

Sample Taken Date11/12/2024 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/12/2024
Sample typeQuality Assurance A brief description of the samplePortable Skid Test
The quantity of what the sample constitutesSkid Testing From where was the sample collectedJob Site
First name of sampler or witnessed byJessie Last name of sampler or witnessed byWilson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAT THE JOB SITE Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameCade Creek Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE
Direction of TravelEast Post Mile
Lanes to be Tested Station

Test Details

DIME Sample ID: 2024-11-12-10
DIME Test ID: 2024-11-12-10-4
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-01-16

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 01/16/2025
Air Temperature: 41
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN APPROACH SLAB
Edge used to measure position: LEFT OF BARRIER
Reference Distance 1: 1
Reference Distance 2: 3
Reference Distance 3: 6
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 7
Position for Stationing 2: 7
Position for Stationing 3: 7
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.34
Corrected Coefficients of Friction for Stationing 3: 0.36
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters): PORTUGUESE CREEK BR#02-0209. APPROACH SLAB. VISUALLY INSPECTED EB APPROACH SLAB AND FOUND IT TO BE UNIFORMED WITH WB

Test was verified on 1/16/2025