Summary for Test 2025-01-09-34-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995449 DEA: 07349504 EFIS: 0718000161 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2,5,101,170-Var |
| Award Date | 02/29/2024 |
| Closeout Date | Not set |
| Work Description | INSTALL NEW TRANSPORTATION MANAGEMENT SYSTEM ELEMENTS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 134/170 SEPARATION TO ROUTE 170/5 SEPARATION |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 01/09/2025 | Sample Unique Key | 34 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/09/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Native |
| The quantity of what the sample constitutes | 140 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Dominic | Last name of sampler or witnessed by | Montemayor |
| Title of sampler | Materials Tester | Telephone number of sampler | 9517643140 |
| Laboratory sample identification | 25-0086 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | MVP 10 SB 170 Roscoe Bl. On-Ramp | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Native | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-01-09-34
DIME Test ID: 2025-01-09-34-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-01-16
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 01/09/2025
Gage No.: 6682
Test No.: 5
Nuclear By: Dominic Montemayor
Non-Bias Plan No.: 8
Depth: 5"
Material No.: Subgrade
Material Type: Native
Impact By: Dominic Montemayor
Standard Count Density: 10712 g/cc
Count or Density 1: 20323 g/cc
Count or Density 2: 15744 g/cc
Count or Density 3: 15791 g/cc
Standard Count Moisture: 19472 g/cc
Moisture Count 1: 2303 g/cc
Moisture Count 2: 1980 g/cc
Moisture Count 3: 1988 g/cc
Sum of Count or Density: 51858 g/cc
Average of Count or Density: 17286 g/cc
Sum of Moisture Count: 6271 g/cc
Average of Moisture Count: 2090.33 g/cc
Calculated Percent Relative Compaction: 91.3 %
Reported Percent Relative Compaction: 91 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/16/2025 ✔
