Summary for Test 2025-01-10-3-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995492 DEA: 07358204 EFIS: 0719000107 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5823- |
| Award Date | 03/29/2024 |
| Closeout Date | Not set |
| Work Description | PROVIDE BUILDING WORK AT A MAINTENANCE STATION. |
| Location Description | LOS ANGELES COUNTY IN LONG BEACH AT THE PACIFIC PLACE MAINTENANCE STATION AT NORTH 3725 PACIFIC PLACE |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 01/10/2025 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/10/2025 |
| Sample type | Acceptance | A brief description of the sample | Structural Backfill |
| The quantity of what the sample constitutes | 1950 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
| Laboratory sample identification | 25-0130 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Structural Backfill |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-01-10-3
DIME Test ID: 2025-01-10-3-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-01-10
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 01/10/2025
Gage No.: 60203
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 4
Depth: 5
Material No.: no data
Material Type: Structural Backfill
Impact By: Michelangelo Sese
Standard Count Density: 2255 g/cc
Count or Density 1: 2.1 g/cc
Count or Density 2: 2.16 g/cc
Count or Density 3: 2.03 g/cc
Standard Count Moisture: 648 g/cc
Moisture Count 1: 0.17 g/cc
Moisture Count 2: 0.18 g/cc
Moisture Count 3: 0.19 g/cc
Sum of Count or Density: 6.29 g/cc
Average of Count or Density: 2.1 g/cc
Sum of Moisture Count: 0.54 g/cc
Average of Moisture Count: 0.18 g/cc
Calculated Percent Relative Compaction: 94.9 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): 3725 N Pacific Place Maintenance Station
Test was verified on 1/10/2025 ✔
