Summary for Test 2025-01-06-26-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 995449
DEA: 07349504
EFIS: 0718000161
DIST-CO-RTE-PM07-LA-2,5,101,170-Var
Award Date02/29/2024
Closeout Date08/28/2026
Work DescriptionINSTALL NEW TRANSPORTATION MANAGEMENT SYSTEM ELEMENTS.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 134/170 SEPARATION TO ROUTE 170/5 SEPARATION
QA Service Level1 (Verified on 01/22/2024)

Sample Information

Sample Taken Date01/06/2025 Sample Unique Key26
Date that the sample was received by the laboratory/organization performing the testing01/06/2025 Sample typeQuality Assurance
A brief description of the sampleNative Material The quantity of what the sample constitutes132 SY
From where was the sample collectedJob Site First name of sampler or witnessed byDominic
Last name of sampler or witnessed byMontemayor Title of samplerMaterials Tester
Telephone number of sampler9517643140 Laboratory sample identification25-0044
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameMVP 5 NB LA170 East of Victory On Ramp
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleNative The fabricator/manufacturer designation for the sampleCompactions Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-06-26
DIME Test ID: 2025-01-06-26-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-01-09

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 01/06/2025
In-place wet density: 1.98
Highest adjust wet density: 2.13
% Moisture: 2.6 %
Optimum Moisture: 6.6 %
Relative compaction: 93
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/9/2025 ✔