Summary for Test 2024-12-20-25-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000245 DEA: 072XN104 EFIS: 0724000222 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-150- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Retaining wall repair due to landslide emergency at Route 150 in Santa Paula. |
| Location Description | Route 150 in Santa Paula. |
| QA Service Level | 1 (Verified on 04/05/2024) |
Sample Information
| Sample Taken Date | 12/20/2024 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/20/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 782 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Dominic | Last name of sampler or witnessed by | Montemayor |
| Title of sampler | Materials Tester | Telephone number of sampler | 951-764-3140 |
| Laboratory sample identification | 24-3952 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Jobsite | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | SP 150; PM 31.33 2nd Lift | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Subgrade | The fabricator/manufacturer designation for the sample | Compaction Testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-12-20-25
DIME Test ID: 2024-12-20-25-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-01-08
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 12/20/2024
Gage No.: 6682
Test No.: 1
Nuclear By: Dominic Montemayor
Non-Bias Plan No.: 10
Depth: 12"
Material No.: Native
Material Type: Subgrade
Impact By: Dominic Montemayor
Standard Count Density: 10776 g/cc
Count or Density 1: 3408 g/cc
Count or Density 2: 3137 g/cc
Count or Density 3: 3447 g/cc
Standard Count Moisture: 19432 g/cc
Moisture Count 1: 5258 g/cc
Moisture Count 2: 5282 g/cc
Moisture Count 3: 5770 g/cc
Sum of Count or Density: 9992 g/cc
Average of Count or Density: 3330.67 g/cc
Sum of Moisture Count: 16310 g/cc
Average of Moisture Count: 5436.67 g/cc
Calculated Percent Relative Compaction: 96.1 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/8/2025 ✔
