Summary for Test 2024-12-04-73-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994977
DEA: 081L3204
EFIS: 0820000026
DIST-CO-RTE-PM08-RIV-91-15.6/21.6
Award Date09/25/2023
Closeout DateNot set
Work DescriptionMINOR CONCRETE, WOOD MULCH & PLANT ESTABLISHMENT WORK.
Location DescriptionRIVERSIDE COUNTY IN RIVERSIDE FROM 0.1 MILE WEST OF ADAMS STREET TO ROUTE 60/91/215 SEPARATION
QA Service Level1 (Verified on 08/15/2023)

Sample Information

Sample Taken Date12/04/2024 Sample Unique Key73
Date that the sample was received by the laboratory/organization performing the testing12/04/2024 Sample typeAcceptance
A brief description of the sampleStructural Backfill The quantity of what the sample constitutesNative Soil Stockpile
From where was the sample collectedJob Site First name of sampler or witnessed byKohnson
Last name of sampler or witnessed byChan Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameNative Soil
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedExcavation from EB91 Off-Ramp to Madison St
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-12-04-73
DIME Test ID: 2024-12-04-73-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-12-30

Test Results


Number of tests: 2
Input Type: Calculated
Tester's full name: Robert Jarquin
Date of test: 12/05/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 12.8
Sand reading (test 1): 1.9
Clay reading (test 2): 13
Sand reading (test 2): 2
Sand equivalent (test 1): 15
Sand equivalent (test 2): 16
Sand equivalent before temperature correction: 16
Sand equivalent after temperature correction: 16
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/30/2024 ✔