Summary for Test 2024-11-22-38-2

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 1000409
DEA: 051S1604
EFIS: 0524000176
DIST-CO-RTE-PM05-MON-1-60
Award Date06/14/2024
Closeout Date08/21/2026
Work DescriptionRocky Creek Slip Out Permanent Restoration Project
Location DescriptionNot set
QA Service Level1 (Verified on 06/26/2024)

Sample Information

Sample Taken Date11/22/2024 Sample Unique Key38
Date that the sample was received by the laboratory/organization performing the testing11/25/2024 Sample typeQuality Control
A brief description of the sampleconcrete The quantity of what the sample constitutes100 cy
From where was the sample collectedJob Site First name of sampler or witnessed byFikra
Last name of sampler or witnessed byJahya Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGraniterock
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number572590
The truck number from where the sample was collected2363 The batch plant ticket number from where the sample was collected201638
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-11-22-38
DIME Test ID: 2024-11-22-38-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-12-30

Test Results


Input Type: Calculated
Tester's full name: Fikra Jahya
Date of test: 11/22/2024
Temperature: 67 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/30/2024 ✔