Summary for Test 2024-12-17-33-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date12/17/2024 Sample Unique Key33
Date that the sample was received by the laboratory/organization performing the testing12/17/2024 Sample typeQuality Assurance
A brief description of the sampleAggregate Base The quantity of what the sample constitutes2000 SY
From where was the sample collectedJob Site First name of sampler or witnessed byManuel
Last name of sampler or witnessed byUy Title of samplerMaterials Tester
Telephone number of sampler9495016042 Laboratory sample identification24-3922
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameMedian A1 Sta 139+00 143+50
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleAggregate Base The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-12-17-33
DIME Test ID: 2024-12-17-33-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-27

Test Results


Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 12/17/2024
Gage No.: 30515
Test No.: 1
Nuclear By: Manuel Uy
Non-Bias Plan No.: 3
Depth: 7"
Material No.: Aggregate Base
Material Type: Aggregate Base
Impact By: Manuel Uy
Standard Count Density: 2953 g/cc
Count or Density 1: 2872 g/cc
Count or Density 2: 2845 g/cc
Count or Density 3: 3070 g/cc
Count or Density 4: 2808 g/cc
Count or Density 5: 2882 g/cc
Standard Count Moisture: 1067 g/cc
Moisture Count 1: 216 g/cc
Moisture Count 2: 208 g/cc
Moisture Count 3: 228 g/cc
Moisture Count 4: 220 g/cc
Moisture Count 5: 235 g/cc
Sum of Count or Density: 14477 g/cc
Average of Count or Density: 2895.4 g/cc
Sum of Moisture Count: 1107 g/cc
Average of Moisture Count: 221.4 g/cc
Calculated Percent Relative Compaction: 96.8 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/27/2024 ✔