Summary for Test 2024-12-12-26-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994966
DEA: 073255U4
EFIS: 0722000129
DIST-CO-RTE-PM07-LA-605-20.2/26
Award Date04/12/2023
Closeout DateNot set
Work DescriptionINDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION
QA Service Level1 (Verified on 07/13/2023)

Sample Information

Sample Taken Date12/12/2024 Sample Unique Key26
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/12/2024
Sample typeQuality Assurance A brief description of the sampleNative Material
The quantity of what the sample constitutes152 SY From where was the sample collectedJob Site
First name of sampler or witnessed byJareerattana Last name of sampler or witnessed bySirisujarittha
Title of samplerMaterials Tester Telephone number of sampler562-564-9465
Laboratory sample identification24-3860 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSB 605 off-ramp Ramona RAM B4 Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleNative The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-12-12-26
DIME Test ID: 2024-12-12-26-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-20

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jareerattana Sirisujarittha
Date of test: 12/12/2024
Gage No.: 35470
Test No.: 4
Nuclear By: Jareerattana Sirisujarittham
Non-Bias Plan No.: 2
Depth: 5"
Material No.: Subgrade
Material Type: Native
Impact By: Jareerattana Sirisujarittham
Standard Count Density: 1752 g/cc
Count or Density 1: 2447 g/cc
Count or Density 2: 2320 g/cc
Count or Density 3: 2241 g/cc
Standard Count Moisture: 734 g/cc
Moisture Count 1: 86 g/cc
Moisture Count 2: 98 g/cc
Moisture Count 3: 229 g/cc
Sum of Count or Density: 7008 g/cc
Average of Count or Density: 2336 g/cc
Sum of Moisture Count: 413 g/cc
Average of Moisture Count: 137.67 g/cc
Calculated Percent Relative Compaction: 90.1 %
Reported Percent Relative Compaction: 90 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/20/2024