Summary for Test 2024-12-12-23-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
| Award Date | 04/12/2023 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 12/12/2024 | Sample Unique Key | 23 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/12/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Native Material |
| The quantity of what the sample constitutes | 151 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jareerattana | Last name of sampler or witnessed by | Sirisujarittha |
| Title of sampler | Materials Tester | Telephone number of sampler | 562-564-9465 |
| Laboratory sample identification | 24-3858 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | NB 605 Ramona off-ramp Ramp B1 | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Native | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-12-12-23
DIME Test ID: 2024-12-12-23-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-20
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jareerattana Sirisujarittha
Date of test: 12/12/2024
Gage No.: 35470
Test No.: 2
Nuclear By: Jareerattana Sirisujarittham
Non-Bias Plan No.: 2
Depth: 5"
Material No.: Subgrade
Material Type: Native
Impact By: Jareerattana Sirisujarittham
Standard Count Density: 1752 g/cc
Count or Density 1: 2073 g/cc
Count or Density 2: 2444 g/cc
Count or Density 3: 2161 g/cc
Standard Count Moisture: 734 g/cc
Moisture Count 1: 208 g/cc
Moisture Count 2: 205 g/cc
Moisture Count 3: 205 g/cc
Sum of Count or Density: 6678 g/cc
Average of Count or Density: 2226 g/cc
Sum of Moisture Count: 618 g/cc
Average of Moisture Count: 206 g/cc
Calculated Percent Relative Compaction: 91.2 %
Reported Percent Relative Compaction: 91 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/20/2024 ✔