Summary for Test 2024-12-12-21-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 12/12/2024 | Sample Unique Key | 21 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/12/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 171 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Manuel | Last name of sampler or witnessed by | Uy |
| Title of sampler | Materials Tester | Telephone number of sampler | 9495016042 |
| Laboratory sample identification | 24-3854 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Southbound SR-14 outside lane and shoulder between Avenue M and Avenue N | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Subgrade | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-12-12-21
DIME Test ID: 2024-12-12-21-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-20
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 12/12/2024
Gage No.: 30515
Test No.: 161.3
Nuclear By: Manuel Uy
Non-Bias Plan No.: 8
Depth: 7"
Material No.: Native Soil
Material Type: Subgrade
Impact By: Manuel Uy
Standard Count Density: 2958 g/cc
Count or Density 1: 3705 g/cc
Count or Density 2: 3690 g/cc
Count or Density 3: 3522 g/cc
Standard Count Moisture: 1091 g/cc
Moisture Count 1: 201 g/cc
Moisture Count 2: 197 g/cc
Moisture Count 3: 168 g/cc
Sum of Count or Density: 10917 g/cc
Average of Count or Density: 3639 g/cc
Sum of Moisture Count: 566 g/cc
Average of Moisture Count: 188.67 g/cc
Calculated Percent Relative Compaction: 95.1 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/20/2024 ✔