Summary for Test 2024-10-29-79-3
Test performed: AASHTO T176-08Project Information
| Project Identifiers | Project ID: 993544 DEA: 07324904 EFIS: 0716000079 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-20.1/36.0 |
| Award Date | 04/21/2022 |
| Closeout Date | 06/09/2025 |
| Work Description | UPGRADE AND REPAIR THREE EXISTING PUMP PLANTS. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM HUMBOLDT STREET UNDERPASS TO SHELDON STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 10/29/2024 | Sample Unique Key | 79 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/17/2024 | Sample type | Acceptance |
| A brief description of the sample | 3/4 HMA- A | The quantity of what the sample constitutes | 90 tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | victor |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | 2137924794 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | All American Asphalt-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA- A R15 | The fabricator/manufacturer designation for the sample | |
| The plant number | Irwindale | A detailed description of where the material sample was collected | Belt Discharge |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | 105793 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-10-29-79
DIME Test ID: 2024-10-29-79-3
Testing Lab: CT D07 - Plant Services, Unit 1841
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2025-01-22
Test Results
How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: A.Truong
Date of test: 11/18/2024
Clay Level (Test 1): 5.9
Sand Level (Test 1): 3.9
Clay Level (Test 2): 5.8
Sand Level (Test 2): 3.8
Clay Level (Test 3): 5.7
Sand Level (Test 3): 3.9
Sand Equivalent (Test 1): 67
Sand Equivalent (Test 2): 66
Sand Equivalent (Test 3): 69
Sand Equivalent: 68
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/22/2025 ✔
