Summary for Test 2024-11-06-79-1

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 1000855
DEA: 021J3104
EFIS: 0220000057
DIST-CO-RTE-PM02-SHA-44-R26.8/71.38
Award DateNot set
Closeout DateNot set
Work DescriptionShingle Station Paving and Drainage.
Location DescriptionIn Shasta County at various locations from 0.3 mile east of Shingletown Ridge Road to Lassen County Line.
QA Service Level1 (Verified on 12/10/2024)

Sample Information

Sample Taken Date11/06/2024 Sample Unique Key79
Date that the sample was received by the laboratory/organization performing the testing11/07/2024 Sample typePreliminary
A brief description of the sample1 bag of Soil The quantity of what the sample constitutesCulvert, Field No. TP-24-004_1
From where was the sample collectedJob Site First name of sampler or witnessed byVictor
Last name of sampler or witnessed byVasquez Title of samplerGeoprofessional
Telephone number of sampler Laboratory sample identificationD79772
Linked DIME Sample ID The fabricator/manufacturer/facility nameIn Situ
Transportation Laboratory (TL) Number875955 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collected02-Sha-44-49.09 W/B, 0 – 2.5' depth
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-11-06-79
DIME Test ID: 2024-11-06-79-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2024-12-12

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Josh Ferency and Ward Jenkins
Date of test: 12/05/2024
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 97 %
Cumulative percent passing the 1 1/2 in. sieve: 97 %
Cumulative percent passing the 1 in. sieve: 95 %
Cumulative percent passing the 3/4 in. sieve: 93 %
Cumulative percent passing the 1/2 in. sieve: 90 %
Cumulative percent passing the 3/8 in. sieve: 87 %
Cumulative percent passing the #4 sieve: 78 %
Cumulative percent passing the #8 sieve: 69 %
Cumulative percent passing the #16 sieve: 59 %
Cumulative percent passing the #30 sieve: 47 %
Cumulative percent passing the #50 sieve: 34 %
Cumulative percent passing the #100 sieve: 22 %
Cumulative percent passing the #200 sieve: 14 %
Cumulative Percent Passing on 5 Microns: 3 %
Cumulative Percent Passing on 1 Micron: 1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/12/2024 ✔