Summary for Test 2024-12-10-6-2

Test performed: CTM 227-December 2014

Project Information

Project IdentifiersProject ID: 995361
DEA: 072XF604
EFIS: 0723000126
DIST-CO-RTE-PM07-VEN-33-24.25/27.3
Award Date03/01/2023
Closeout DateNot set
Work DescriptionRebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW
Location DescriptionNot set
QA Service Level1 (Verified on 11/27/2023)

Sample Information

Sample Taken Date12/10/2024 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/10/2024
Sample typeAcceptance A brief description of the sample3/8" X #8
The quantity of what the sample constitutes18 CY From where was the sample collectedManufacturer
First name of sampler or witnessed byKevin Last name of sampler or witnessed byHopkins
Title of samplerPlant Inspector Telephone number of sampler
Laboratory sample identificationKH103C Linked DIME Sample ID
The fabricator/manufacturer/facility nameAssociated Ready Mix - Oxnard Transportation Laboratory (TL) NumberC121024A
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0054
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number47500 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-12-10-6
DIME Test ID: 2024-12-10-6-2
Testing Lab: CT D07 - Plant Services
Test Method: CTM 227-December 2014: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)
Test Release Date: 2025-01-28

Test Results


Describe the gradation of the aggregate or the test method:: All aggregate is the same size
Input Type: Measured
Tester's full name: Kevin Hopkins
Date of test: 12/10/2024
Top sediment column reading (single primary size): 0.3 in
Cleanness value (single primary size): 91
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/28/2025