Summary for Test 2024-12-05-37-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 2949 DEA: 05330714 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-51.7/59.8 |
| Award Date | 01/10/2008 |
| Closeout Date | 08/29/2012 |
| Work Description | CONVERT 2 LANE HIGHWAY TO 4 LANE EXPRESSWAY |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/19/2012) |
Sample Information
| Sample Taken Date | 12/05/2024 | Sample Unique Key | 37 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/05/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Portable Skid Testing |
| The quantity of what the sample constitutes | skid testing | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | job site | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Cholame Creek Br. | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | 05-SLO-46 |
| Direction of Travel | West | Post Mile | |
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2024-12-05-37
DIME Test ID: 2024-12-05-37-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-12-10
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 12/05/2024
Air Temperature: 61 F
Tire Pressure: 25 psi
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Bridge Wall
Reference Distance 1: 78 ft
Reference Distance 2: 81 ft
Reference Distance 3: 84 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 13 ft
Position for Stationing 2: 13 ft
Position for Stationing 3: 13 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.39
Corrected Coefficients of Friction for Stationing 2: 0.40
Corrected Coefficients of Friction for Stationing 3: 0.39
Average Coefficient of Friction: 0.39
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/10/2024 ✔
