Summary for Test 2024-11-26-33-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214697 DEA: 07307104 EFIS: 0714000213 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-32.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | CONSTRUCT BRIDGE. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 11/26/2024 | Sample Unique Key | 33 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/26/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Structural Backfill |
| The quantity of what the sample constitutes | 40 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Manuel | Last name of sampler or witnessed by | Uy |
| Title of sampler | Materials Tester | Telephone number of sampler | 949-501-6042 |
| Laboratory sample identification | 24-3659 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Behind Abutment 1 | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Structural backfill | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-11-26-33
DIME Test ID: 2024-11-26-33-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-06
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 11/26/2024
Gage No.: 30515
Test No.: 2
Nuclear By: Manuel Uy
Non-Bias Plan No.: 5
Depth: 12"
Material No.: Native
Material Type: Structural Backfill
Impact By: Manuel Uy
Standard Count Density: 2955 g/cc
Count or Density 1: 778 g/cc
Count or Density 2: 753 g/cc
Count or Density 3: 825 g/cc
Standard Count Moisture: 1076 g/cc
Moisture Count 1: 231 g/cc
Moisture Count 2: 215 g/cc
Moisture Count 3: 178 g/cc
Sum of Count or Density: 2356 g/cc
Average of Count or Density: 785.33 g/cc
Sum of Moisture Count: 624 g/cc
Average of Moisture Count: 208 g/cc
Calculated Percent Relative Compaction: 98.1 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/6/2024 ✔
