Summary for Test 2024-11-26-31-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
| Sample Taken Date | 11/26/2024 | Sample Unique Key | 31 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/26/2024 |
| Sample type | Quality Assurance | A brief description of the sample | Structural Backfill |
| The quantity of what the sample constitutes | 4.44 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Kreetha | Last name of sampler or witnessed by | Mekchai |
| Title of sampler | Materials Tester | Telephone number of sampler | 626-764-5399 |
| Laboratory sample identification | 24-3657 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | RCB-14-4 | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Structural backfill | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-11-26-31
DIME Test ID: 2024-11-26-31-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-06
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Kreetha Mekchai
Date of test: 11/26/2024
Gage No.: 35470
Test No.: 2
Nuclear By: Kreetha Mekchai
Non-Bias Plan No.: Plan 3
Depth: 12"
Material No.: Native
Material Type: Structural Backfill
Impact By: Kreetha Mekchai
Standard Count Density: 1753 g/cc
Count or Density 1: 259 g/cc
Count or Density 2: 263 g/cc
Count or Density 3: 257 g/cc
Standard Count Moisture: 727 g/cc
Moisture Count 1: 141 g/cc
Moisture Count 2: 137 g/cc
Moisture Count 3: 136 g/cc
Sum of Count or Density: 779 g/cc
Average of Count or Density: 259.67 g/cc
Sum of Moisture Count: 414 g/cc
Average of Moisture Count: 138 g/cc
Calculated Percent Relative Compaction: 96.4 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/6/2024 ✔