Summary for Test 2024-12-02-1-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
|---|---|
| DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
| Award Date | 05/19/2022 |
| Closeout Date | Not set |
| Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
| Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
| QA Service Level | 1 (Verified on 01/14/2020) |
Sample Information
| Sample Taken Date | 12/02/2024 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/02/2024 |
| Sample type | Acceptance | A brief description of the sample | BRIDGE |
| The quantity of what the sample constitutes | pcc | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
| Title of sampler | Telephone number of sampler | 9152961873 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Moving Lane Closure | DIST-CO-RTE | |
| Direction of Travel | Post Mile | ||
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2024-12-02-1
DIME Test ID: 2024-12-02-1-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-12-05
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 12/05/2024
Air Temperature: 58
Tire Pressure: 24
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN TRIAL SLAB
Edge used to measure position: LEFT OF BARRIER
Reference Distance 1: 1
Reference Distance 2: 4
Reference Distance 3: 7
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 5
Position for Stationing 2: 5
Position for Stationing 3: 5
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.44
Corrected Coefficients of Friction for Stationing 2: 0.50
Corrected Coefficients of Friction for Stationing 3: 0.47
Average Coefficient of Friction: 0.47
General comments (publicly viewable) (Max 1000 characters): San Juan Bridge/TRIAL SLAB
Test was verified on 12/5/2024 ✔
