Summary for Test 2024-11-19-32-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994968 DEA: 120M82C4 EFIS: 1219000036 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-1-7.9/10.5 |
| Award Date | 12/13/2022 |
| Closeout Date | 12/01/2025 |
| Work Description | Place RHMA-G and minor concrete and modify electrical system. |
| Location Description | In Orange County In Laguna Beach, On State Route 1 (Also Known As Pacific Coast Highway Or Sr-1) From Ruby Street (Pm 7.9) To Ledroit |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 11/19/2024 | Sample Unique Key | 32 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/19/2024 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4 RHMAG | The quantity of what the sample constitutes | 3/4 RHMAG |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Jimmy |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 24-1073 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Blue Diamond Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-11-19-32
DIME Test ID: 2024-11-19-32-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-12-04
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: David Nguyen
Date of test: 11/25/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 4020.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 6022.7 g
Mass of HMA Sample prior to ignition: 2002.2 g
Mass Loss: 150.8 g
Mass of aggregate remaining after ignition: 1851.4 g
Correction Factor (Percent by mass of HMA Specimen): 0.14 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.39 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 2024AC-SP-0079 | 105.06 KB | 11/26/2024 | 2024-11-19-32-1 | Info |
Test was verified on 12/4/2024 ✔
