Summary for Test 2024-11-18-16-2
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
Award Date | 10/22/2021 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/03/2019) |
Sample Information
Sample Taken Date | 11/18/2024 | Sample Unique Key | 16 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/19/2024 |
Sample type | Quality Assurance | A brief description of the sample | 3/4" HMA-A-SP PG70-10 R25 |
The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Hubbart |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | HMA-R189 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Fisher Sand and Gravel - Olancha | Transportation Laboratory (TL) Number | 4511 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number |
Test Details
DIME Sample ID: 2024-11-18-16
DIME Test ID: 2024-11-18-16-2
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-11-19
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Jerid Kupelian
Date of test: 11/18/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 4272.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 6654.7 g
Mass of HMA Sample prior to ignition: 2382.1 g
Mass Loss: 107.6 g
Mass of aggregate remaining after ignition: 2274.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.06 %
Moisture Content: 0 %
Temperature Compensation Factor: 0 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.46 %
General comments (publicly viewable) (Max 1000 characters): HMA-R189
Test was verified on 11/19/2024 ✔