Summary for Test 2024-11-06-15-3
Test performed: AASHTO T176-08Project Information
| Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
| Award Date | 11/06/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
| QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
| Sample Taken Date | 11/06/2024 | Sample Unique Key | 15 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/06/2024 | Sample type | Acceptance |
| A brief description of the sample | 1/2 WMA-A R25 | The quantity of what the sample constitutes | 0-750Tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Kevin |
| Last name of sampler or witnessed by | Hopkins | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Materials HMA - Sun Valley | |
| Transportation Laboratory (TL) Number | C110624B | Inspector Lot Number from the Transportation Laboratory (TL) Form | KH202B |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0035 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 1/2 WMA-A R25 | The fabricator/manufacturer designation for the sample | |
| The plant number | Sun Valley | A detailed description of where the material sample was collected | Belt Discharge |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
| The concrete mix design number | 320200W SVA VLO | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-11-06-15
DIME Test ID: 2024-11-06-15-3
Testing Lab: CT D07 - Plant Services, Unit 1841
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2024-11-20
Test Results
How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Kevin Hopkins
Date of test: 11/07/2024
Clay Level (Test 1): 5.5
Sand Level (Test 1): 3.9
Clay Level (Test 2): 5.7
Sand Level (Test 2): 4
Clay Level (Test 3): 5.4
Sand Level (Test 3): 3.9
Sand Equivalent (Test 1): 71
Sand Equivalent (Test 2): 71
Sand Equivalent (Test 3): 73
Sand Equivalent: 72
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/20/2024 ✔
