Summary for Test 2024-11-04-7-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/23/2021 |
| Closeout Date | Not set |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 11/04/2024 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/04/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 RHMA-G |
| The quantity of what the sample constitutes | 10 Boxes 4 Bags 2 Cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Chris | Last name of sampler or witnessed by | El |
| Title of sampler | Material Tester | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta - Visalia | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 9 |
| Sublot number | 55 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-11-04-7
DIME Test ID: 2024-11-04-7-2
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-11-04
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Jason Ruiz
Date of test: 11/04/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 2924.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 4976.7 g
Mass of HMA Sample prior to ignition: 2052.7 g
Mass Loss: 161.7 g
Mass of aggregate remaining after ignition: 1891.0 g
Correction Factor (Percent by mass of HMA Specimen): -0.05 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 7.79 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-360244_37044_241104_L9SL55_T308_RHMA | 124.23 KB | 11/04/2024 | 2024-11-04-7-2 | Info |
Test was verified on 11/4/2024 ✔
